Airtightness without mould
Posted by Trevor James on February 20, 2026 at 7:40 pmBest tapes, foams, and sequencing tips? Thanks
John Docherty replied 9 months, 1 week ago 3 Members · 4 Replies - 4 Replies
-
Hi Trevor, we are in Beta testing mode at the moment but we’d love to give you an idea of what advice we have on file… Firstly, Trevor what work are you doing (loft, IWI to solid brick, cavity retrofit, etc.), we can suggest a very specific tape/foam combo and an order of operations that can be followed on site. The more detail you can publish the better the fit we can provide. Nevertheless, see below for your sequencing tips;
Sequencing tips (to stay airtight and mould‑safe)
For a typical UK retrofit (loft, internal wall insulation, or airtightness upgrade):
1. Plan the airtight line
– Decide which surface is your continuous air barrier (e.g. existing wet plaster, new intelligent membrane, taped.
– Sketch how it runs past floors, ceilings, joists, windows, services so you’re not improvising on site.
2. Sort the leaky bits first
– Seal obvious holes and cracks, ceiling penetrations, downlighter boxes, loft hatches, service risers with appropriate tapes or system sealants.
– In roofs, BS 5250 expects a “well‑sealed ceiling” plus proper ventilation or vapour‑open underlay detailing to control condensation.
3. Windows and doors (inner tighter than outer)
– Install frame ideally within the insulation zone, not hard against cold masonry where possible.
– Outer side: apply vapour‑open weather tape or impregnated foam tape to frame and external reveal.
– Middle: low‑exp PU foam or mineral wool for thermal/acoustic infill.
– Inner side: apply internal airtight tape (e.g. Contega Solido SL) from frame onto plaster or onto your VCL/membrane, then plaster over the fleece‑backed tape.
4. Warm‑side VCL / intelligent membrane
– After insulation is installed snugly, fix the VCL/intelligent membrane on the warm side, lapping and taping all joints.
– Use compatible tapes/adhesives at all junctions to walls, floors, beams, roof windows, etc., tying back into any airtight plaster or airtight boards.
– Add a service void inside the membrane where you can, to keep electrics and pipework from peppering your airtight layer with holes.
5. Ventilation and moisture control
– Once the envelope is tight, ensure you have reliable extract in wet rooms and sufficient background ventilation (trickle vents, MEV, MVHR, as appropriate) to keep internal humidity down and reduce mould risk.👋
-
Thanks, John, for all the information. I’m looking forward to the official launch. It’s a great place for questions and answers based on real experience, a refreshing change from AI. I’m doing retrofit mainly around existing windows and doors. Post installation. I was thinking of using Pro Clima Contiga, as it’s had high praise from a few peers.
-
Think of airtightness as working in layers, and always protect those seals from follow-on trades. Failures usually come down to dust, cold surfaces, or folks puncturing membranes without patching them up. Sequencing and discipline count just as much as picking the right product. 👍🏻
JM
-
On industrial tapes I can recommend nearly any tape for construction or specialist use. In the 80’s we owned a company named Astratape Ltd and were heavily involved in supplying construction related companies and distributors. So when we launch we’re here for you on that matter, we have many trade contacts. 🙋♂️